Video: Staying on track at 2 AM

Night work on the rail network accelerates rail traffic.

30.01.2017 | Article

Temperatures just over freezing, rain by the bucketful. Deutsche Bahn uses each night for the maintenance of its rail network. A camera team from Porsche Consulting recorded them in action: on the West Rhine Railway between Koblenz and Bonn, the moving parts of a switch – the tongue rails in this case – were replaced in record time. Together with the management consultancy Porsche Consulting, Deutsche Bahn redesigned the procedures of its track construction team. The measurable result: shorter track closures and freed-up capacities for work on other parts of the rail system. Strategic vision, smart implementation. Porsche Consulting.

Aperçus

Actualités

Changement au sein du comité de direction de Porsche Consulting

Federico Magno rejoint la direction de MHP

Porsche Consulting & Agora Strategy

Intégrer les enjeux géopolitiques pour conseiller les dirigeants dans leurs orientations stratégiques

Lean Portfolio Management

Comment fournir aux clients des solutions numériques performantes

Filtrer

Industries

Practices