Video: Staying on track at 2 AM

Night work on the rail network accelerates rail traffic.

30.01.2017 | Article

Temperatures just over freezing, rain by the bucketful. Deutsche Bahn uses each night for the maintenance of its rail network. A camera team from Porsche Consulting recorded them in action: on the West Rhine Railway between Koblenz and Bonn, the moving parts of a switch – the tongue rails in this case – were replaced in record time. Together with the management consultancy Porsche Consulting, Deutsche Bahn redesigned the procedures of its track construction team. The measurable result: shorter track closures and freed-up capacities for work on other parts of the rail system. Strategic vision, smart implementation. Porsche Consulting.

Insights

Trends & Solutions

Top Position in the Lünendonk Ranking 2024

Porsche Consulting remains in fourth place among German management consultancies

Porsche Production 4.0

Porsche Consulting showcases Smart Factory in action

Change in the management of Porsche Consulting

Federico Magno joins the management of MHP

Filter

Industries

Practices